One stop electronic Industry Control PCBA board manufacturer
CAPABILITIES
● -Layer Count: 2L/4L/6L/8L/10L
● -Max. Delivery Panel Size: 699mm×594mm
● -Max. Copper Weight (Inner/Outer Layer): 12oz
● -Max.Board Thickness: 5.0mm
● -Max. Aspect Ratio: 15:1
● -Surface Finish: LF-HASL, ENIG, Imm-Ag, Imm-Sn, OSP, ENEPIG, Gold Finger
Our Services
One-stop PCB and PCBA electronic manufacturing services
1.PCB manufacturing service: Need Gerber file(CAM350 RS274X), PCB files(Protel 99,AD,Eagle),etc
2.Components sourcing services :BOM list included detailed Part number and Designator
3.PCB assembly services :The above files and Pick and Place files,assembly drawing
4.Programming & Testing services :Program,instrouction and test method etc.
5.Housing assembly services: 3D files,step or others
6.Reverse engineering services: Samples and others
7.Cable & wire assembly services :Specification & others
8.Others services: Value-added services
PCB Techinecal Capacity
Layers | Mass production: 2~58 layers / Pilot run: 64 layers |
Max. Thickness | Mass production: 394mil (10mm) / Pilot run: 17.5mm |
Material | FR-4 (Standard FR4, Mid-Tg FR4,Hi-Tg FR4, Lead free assembly material) , Halogen-Free, Ceramic filled , Teflon, Polyimide, BT, PPO, PPE, Hybrid, Partial hybrid, etc. |
Min. Width/Spacing | Inner layer: 3mil/3mil (HOZ), Outer layer: 4mil/4mil(1OZ) |
Max. Copper Thickness | UL certificated: 6.0 OZ / Pilot run: 12OZ |
Min. Hole Size | Mechanical drill: 8mil(0.2mm) Laser drill: 3mil(0.075mm) |
Max. Panel Size | 1150mm × 560mm |
Aspect Ratio | 18:1 |
Surface Finish | HASL,Immersion Gold, Immersion Tin, OSP, ENIG + OSP, Immersion Silver, ENEPIG, Gold Finger |
Special Process | Buried Hole, Blind Hole, Embedded Resistance, Embedded Capacity, Hybrid, Partial hybrid, Partial high density, Back drilling, and Resistance control |
FAQ
Pls Confirm With Us The Modle You Need.And The Sample Fee Will Be Refunded In Bulk.
Sample Will Be Send Out Within 2days After Received Payment
Normally It Takes 5 Working Days After Received Payment.
100% QC Before Shipment.If There're Some Unexpected Problem Happan,Like Quality Problem
Normally It Takes 5 Working Days After Received Payment.